Activity Report

Relatório compartilhado

OCL | CIEL | Madiro contract

2026-02-01 - 2026-07-31

Horas trabalhadas

511h

Dias ativos

116

Atividades

182

Média por dia ativo

4:24:18

Horas por

2026-02-01 - 2026-07-31

182 activities

OCL | CIEL | Madiro contract · 2026-02-01 - 2026-07-31 · Page 1 of 4

DateDayStartEndDurationDescription
07/02/2026Thu08:55:0111:11:122:16:11Initiated Phase 2 development of the MCP App by integrating Code Search into the bulk editing primary workflow; participated in a team meeting to present the latest changes positioning CIEL Lab as the primary CIEL concept management interface while keeping OCL as the source of truth.
07/01/2026Wed20:16:0000:00:143:44:14Corrected issues related to broken CIEL term indexing that prevented the MCP App from returning search results. Centralized all OCL concept editing operations in CIEL Lab with robust per-user audit logging. Concept updates are now applied locally first and then synchronized to the OCL API with retry and rollback mechanisms on failure, improving application responsiveness while preserving data consistency and traceability.
07/01/2026Wed07:13:5208:00:000:46:08Accountant report (June time tracking and activities report)
06/29/2026Mon16:52:1620:30:003:37:44Prepared an ICD-11 Agent effectiveness report with corrected evaluation metrics; improved retired-pages filtering to display retired mappings even when no replacement suggestions are available, ensuring more complete review coverage for deprecated terminology.
06/28/2026Sun19:33:0022:19:552:46:55Creating an evaluation dataset based on curated IMO mapping results to measure agent effectiveness and compare performance across iterations; reviewing and responding to feedback from the CIEL release executed through CIEL Lab/OCL, documenting findings and defining the next implementation and validation steps.
06/27/2026Sat13:23:1816:53:423:30:24Correcting bugs in CIEL Lab, implementing Concept Manager enhancements requested by Andy, and monitoring the first end-to-end CIEL release executed through CIEL Lab connected to the OCL production environment, including validation of the release workflow and production behavior.
06/26/2026Fri11:02:5218:02:376:59:45Creating a Langfuse curation form to improve the ICD-11 Agent, since excessive extension codes are confusing the OCL AI Assistant; initiating the evaluation dataset described in https://github.com/OpenConceptLab/ocl_issues/issues/2524 to measure standalone agent performance across iterations. Also included time spent learning Langfuse and refactoring the local environment to restore the Code Normalizer and ICD-11 Agent after migrating the embedding service to the production infrastructure, along with participation in the weekly CIEL meeting.
06/25/2026Thu17:45:1619:41:111:55:55Completed production validation of the MySQL dump generation pipeline using data sourced from OCL, confirming successful end-to-end generation and content verification against the expected OpenMRS 1.11 output.
06/25/2026Thu12:47:4813:12:360:24:48Closing work related to the Required Class Mappings workflow; fixing CIEL Lab connectivity and toast notification issues encountered after migrating to the OCL environment; and initiating the production validation workflow by comparing generated MySQL dumps to verify release equivalence.
06/25/2026Thu08:27:1511:45:593:18:44Fixing POST behavior for required mappings in OCL HEAD through CIEL Lab; testing the OpenMRS 1.11 mysqldump using the new CIEL version in OCL; creating an oclweb2 improvement and PR to display retired_reason; updating multiple GitHub tickets assigned to me; participating in the weekly meeting.
06/24/2026Wed14:58:0716:00:001:01:53Development of fixes and tests for creating mappings directly in OCL HEAD through the Required Class Mappings workflow.
06/24/2026Wed09:09:5412:18:563:09:02Creating oclweb2 functionality to display retired names and descriptions; received a green light for deploying the CIEL retired-names changes to production and am awaiting the next production release test cycle and MySQL dump validation. Also completed the MVP for importing recommendations into the CIEL Lab Required Class Mappings workflow and deployed a new CIEL Lab version to production.
06/22/2026Mon17:07:3418:51:051:43:31Creating and refining PRs across ocldev, oclapi2, and ocl_omrs to address external issues identified during the CIEL release workflow through OCL; documenting tickets and coordinating through email to help prioritize remaining work and define the execution plan for the available time. In parallel, developing MCP Worklist Preview and Approval for CIEL Lab, serving as a bridge between Phase 1 (candidate generation) and Phase 2 (guided review and editing workflows).
06/22/2026Mon10:29:1612:39:342:10:18Evaluating the root cause of missing voided-name synchronization in the CIELAdmin → OCL pipeline; designing and implementing MCP App worklist previews to enable creation of candidate worklists with LLM assistance, allowing users to review generated concepts and mappings before creating the final worklist.
06/19/2026Fri10:59:1615:13:274:14:11Completed the report identifying missing voided/retired names in the synchronization and release validation process. The analysis is available at https://static.orango.io/artifacts/ciel-dump-comparison-20260619.html and was used to validate content parity between CIELAdmin-generated artifacts and the new CIEL Lab release pipeline.
06/18/2026Thu09:09:2410:30:001:20:36Meeting with the OCL/CIEL team to present analytics and findings from the recent CIEL release validation tests performed through OCL, including comparison results between CIEL Lab and CIELAdmin-generated artifacts; participation in the FHIR planning meeting to discuss upcoming integration milestones positioning OCL as a FHIR terminology repository for downstream applications, including collaboration with FHIR Smith as part of the NHDD Brazil initiative.
06/17/2026Wed21:47:3123:58:092:10:38Finalized production validation tests comparing the SQL generated by CIEL Lab against the SQL generated through the CIELAdmin dump process; results and analysis were shared with Andrew. Reported a potential mapping.retired synchronization issue to Burke after identifying discrepancies during QA validation and am currently awaiting feedback on whether the behavior is intentional or a gap in the synchronization pipeline.
06/17/2026Wed14:43:0316:08:571:25:54Added missing metadata to the export script, including Dose Form Group handling; addressing review feedback from Sunny and applying the required corrections and refinements to the pull request.
06/17/2026Wed08:28:0812:30:004:01:52Reconciling SQL comparison tests where concept_id and uuid uniqueness differ because the files were generated in different environments, using fallback/caveat-based data reconciliation to assess whether the semantic content remains equivalent; applying corrections to PR https://github.com/OpenConceptLab/oclapi2/pull/879; reviewing PR https://github.com/OpenConceptLab/oclapi2/pull/881.
06/16/2026Tue03:33:2505:07:271:34:02Correction and follow-up work on OCL for https://github.com/OpenConceptLab/oclapi2/pull/879; initiated a staging release through CIEL Lab and currently awaiting export artifact generation for testing; pending definition of the approach for mapping external sources to canonical CIEL URIs (hardcoded vs. dynamic resolution), awaiting feedback from Burke.
06/15/2026Mon19:33:4420:13:000:39:16Finalizing the first phase of staging vs. production release testing and reporting; investigating discrepancies related to canonical mapping URIs and evaluating strategies to ensure consistency between CIEL Lab outputs and existing release artifacts.
06/15/2026Mon13:18:4615:12:201:53:34Testing equivalence between changes applied through CIEL Lab → Staging and CIELAdmin → Production workflows; implementing improvements to the CIEL Lab release process and enhancing diff verification mechanisms to validate release consistency and detect discrepancies between environments.
06/15/2026Mon08:37:4909:56:061:18:17Meeting to assess current blockers and review with Sunny the issues that need to be resolved so we can move forward with testing activities; initiated the HEAD export process from CIEL Lab, which is expected to take a couple of hours to complete.
06/14/2026Sun14:52:5515:12:000:19:05Evaluating staging tests to clean CIEL HEAD in staging, but blocked by HEAD export permission limitations; reported the issue on Slack and unable to proceed until access or guidance is provided.
06/13/2026Sat10:37:4713:25:002:47:13Verifying the current state of production and staging changelogs to initiate compatibility testing for release scripts; implementing improvements in CIEL Lab to enhance mapping changelog generation and validate metadata changes through data hydration mechanisms.
06/12/2026Fri11:19:5014:26:033:06:13Meeting with Andy and Joe to align expectations at the end of the first phase of the project; created a pull request to address feedback and action items from the meeting, with the remaining technical follow-up tracked at https://github.com/OpenConceptLab/oclapi2/pull/879; deployed a new version of CIEL Lab to the production environment.
06/11/2026Thu08:41:2612:31:073:49:41Demo showcase of the manual release process; implemented multiple fixes and improvements to the worklist management workflow, focusing on lifecycle consistency, usability, and integration across CIEL Lab components.
06/10/2026Wed23:11:4100:28:171:16:36Unifying the worklist abstraction layer across CIEL Lab to centralize lifecycle management, reduce duplicated logic, and provide a consistent interface for creating, updating, resolving, and consuming worklists throughout the application. More tests
06/10/2026Wed14:39:4817:29:002:49:12Improvements to CIEL Lab, including updates to the MCP App and indexing pipeline to return retired concepts in search results; addition of external data sources for Concept Management worklists; refactoring with a centralized abstraction for worklist lifecycle management across the application; guidance provided during a meeting with Andrew for MCP App installation and the CIEL Lab release testing process; correction of the mysqldump export process to include retired names in the final output artifacts.
06/10/2026Wed08:30:0012:03:003:33:00Corrections and fixes in CIEL Lab; discussions around testing processes and validation strategies; adjustments to the CIEL Lab testing environment to support components that behaved differently under production-scale data volumes compared to development; continued progress on the translation pipeline refactoring.
06/08/2026Mon22:24:4800:03:571:39:09Further improvements to data synchronization, cache management, and update workflows in the new CIEL Lab architecture; currently awaiting Ian Batcher to begin end-to-end release testing in the staging environment.
06/08/2026Mon16:53:2618:00:001:06:34Applying alternative approaches to update CIEL HEAD in staging due to performance constraints.
06/08/2026Mon08:56:2309:30:000:33:37Testing and exploring alternative approaches to update CIEL HEAD in staging due to performance constraints.
06/07/2026Sun22:30:0000:17:391:47:39Removal of the CIELAdmin adapter as part of the transition to an OCL-only architecture; documentation of pending staging validation items, including OpenMRS OCL Module testing and investigation of OCL staging server performance issues; improvements to the production environment to support stability, release workflows, observability, and overall platform operation.
06/06/2026Sat07:50:0610:00:002:09:54Correcting issues and performing end-to-end testing of the release workflow using minimal changes for validation purposes; successfully completed the full release process, including generation and verification of the OpenMRS 1.11 SQL Schema artifacts.
06/05/2026Fri10:03:1011:56:261:53:16Released and tested the new CIEL Lab version in the production environment; participated in the CIEL meeting with Jon while waiting for Andy to join for a demonstration of the release workflow and MCP App integration with CIEL Lab; continued improvements and fixes to the OCL-based release workflow, including release validation, version comparison, and operational readiness for future demonstrations.
06/05/2026Fri03:30:0004:58:041:28:04Improvements to user management within the administration panel; enhancements to the Diff and Release workflows in CIEL Lab, including interface refinements, usability improvements, and support for release-review activities directly through the platform.
06/04/2026Thu08:47:4811:25:242:37:36Creating a release trigger workflow in the CIEL Lab interface (WIP), currently implementing the Release Diff page for version-to-version comparison and release review; participating in the weekly OCL meeting with an MCP App showcase; implementing fixes and refinements based on feedback gathered during the demonstration.
06/03/2026Wed08:18:2911:22:313:04:02Created an OpenMRS snapshot of a third-party instance at Andrew’s request; performed a release of the latest CIEL version for upcoming testing activities; tested the latest MCP App version across multiple use cases with successful results and reported findings; continued validation of MCP-driven terminology workflows and operational readiness for broader demonstrations.
06/01/2026Mon09:30:0012:34:223:04:22Planning meeting; troubleshooting the latest HAR file with Andrew; creating an incremental synchronization script for Lookup repositories; researching Foundation URI handling for post-coordinated content; additional testing and usability improvements for the CIEL Lab MCP App in Claude Desktop, focusing on workflow optimization and user experience.
05/31/2026Sun17:55:2722:30:004:34:33Adding additional Qdrant indexing for CIEL; developing with ngrok to enable live viewing of the MCP App development environment through Claude Desktop; improving indexing workflows and migrating the dashboard toward exclusive OCL-based operation as part of the effort to remove all remaining CIELAdmin dependencies from CIEL Lab; enhancing the cold-storage architecture using S3-compatible buckets for artifact retention, exports, and historical release assets.
05/29/2026Fri08:33:4915:01:006:27:11CIEL meeting; first working release of the CIEL MCP App (WIP); improvements to CIEL Lab indexing and external code search capabilities; validation and refinement of semantic search workflows and MCP-based user interactions within the CIEL ecosystem.
05/28/2026Thu07:34:5913:30:005:55:01Team meeting with updates from Jon regarding Geneva and Rotterdam, as well as the success of the OCL/HL7 Brazil presentation in Portuguese; troubleshooting the CIEL Lab MCP App and improving observability for AI Agent service calls; refactoring the CIEL Lab indexing function to support semantic search using a coupled approach; correcting the ICD-11 Lookup and troubleshooting HTML-encoded ICD-11 code issues in CIEL Admin
05/27/2026Wed23:26:4101:15:001:48:19Adjusting compliance, observability, and service monitoring for the ICD-11 Agent / API / Code Normalizer stack and CIEL Lab (including related installations) in the new infrastructure environment (WIP)
05/27/2026Wed22:00:0023:23:261:23:26Adjusting compliance, observability, and service monitoring for the ICD-11 Agent / API / Code Normalizer stack and CIEL Lab (including related installations) in the new infrastructure environment (WIP)
05/27/2026Wed07:55:5512:30:004:34:05Adjusting compliance, observability, and service monitoring for the ICD-11 Agent / API / Code Normalizer stack and CIEL Lab (including related installations) in the new infrastructure environment (WIP)
05/26/2026Tue08:21:2612:00:003:38:34Adjusting compliance, observability, and service monitoring for the ICD-11 Agent / API / Code Normalizer stack and CIEL Lab (including related installations) in the new infrastructure environment (WIP)
05/25/2026Mon08:28:5812:33:004:04:02Troubleshooting long-latency responses and fixing AI Agent API behavior related to https://github.com/OpenConceptLab/ocl_issues/issues/2537 (https://openmrs.slack.com/archives/C0A99PV25NG/p1779462121356489); continuing deployment of services into the new environment for CIEL Lab and the AI Agent with improved monitoring and observability; testing the CIEL Lab MCP App integration (WIP)
05/22/2026Fri14:00:0015:30:001:30:00Created proposal for webhook feature implementation https://github.com/OpenConceptLab/ocl_issues/issues/2535; testing and deployment of the new CIEL Lab infrastructure with MCP App integration (WIP)
05/22/2026Fri10:00:0012:30:002:30:00Fixing ICD Agent bug (autocode non leaf results); meeting with Andrew (CIEL call); testing and deployment of the new CIEL Lab infrastructure with MCP App integration (WIP)